Investing in Our Facilities

Springville-Griffith Institute Central School District

► Investing in Our Facilities

Referendum planning and community outreach played an important role in making this $27.8 million capital project a reality. Community conversations and voter feedback helped the District package a project that would address its immediate and critical facilities needs with an efficient project plan and cost-effective financing.

High School:

  • Pavement reconstruction and sidewalk replacement
  • Resurface and expand existing track
  • Replace overhead electrical lines with underground
  • Improve handicap accessibility at toilet rooms
  • Asbestos abatement
  • Refinish gym floor
  • Masonry restoration
  • Replace existing pool roof
  • Replace original steam boilers with new, more energy-efficient boilers
  • Replace miscellaneous electrical panels
  • Replace overhead stage rigging
  • Renovate basement locker room
  • Replace non-code compliant press box and structure
  • Concession stand upgrades
  • Greenhouse improvements

Middle School:

  • Replace 14 heating / ventilating units
  • Install new handicap-accessible Nurse’s toilet
  • Kitchen ventilation
  • Upgrade / replace water services
  • Replace all corridor lockers
  • Asbestos abatement
  • Corridor flooring replacement
  • Replace entire roof

Colden Elementary:

  • Pavement reconstruction and sidewalk replacement
  • Kitchen hood and piping replacement
  • Asbestos abatement
  • Replace all carpet with new vinyl flooring
  • Roofing repairs
  • New fire alarm system

Springville Elementary:

  • Pavement reconstruction and sidewalk replacement
  • Replace deteriorated site lighting with energy-efficient LED lighting
  • Repave primary and intermediate playgrounds
  • Replace vinyl asbestos flooring with new vinyl flooring
  • Refinish gym and stage wood floors
  • Partial roof replacement
  • Masonry restoration
  • New energy-efficient classroom ventilators and casework
  • Replace original boilers with more energy-efficient boilers
  • Replace gymnasium and cafeteria ceiling and lighting

District Offices:

  • Roof replacement
  • Upgrade toilet rooms for handicapped accessibility

Additional Resources:

Featuref Project: P-TECH Academy
Springville-Griffith Institute CSD: District Website
Springville-Griffith Institute CSD: P-TECH Academy


Architect: 
Gordon W. Jones Architects
Location: 
Springville, NY
Region: 
Budget: 
$27.8 Million
Services: 
Referendum Planning, Construction Management
Completion: 
2019