Investing in Our Facilities
Springville-Griffith Institute Central School District
► Investing in Our Facilities
Referendum planning and community outreach played an important role in making this $27.8 million capital project a reality. Community conversations and voter feedback helped the District package a project that would address its immediate and critical facilities needs with an efficient project plan and cost-effective financing.
High School:
- Pavement reconstruction and sidewalk replacement
- Resurface and expand existing track
- Replace overhead electrical lines with underground
- Improve handicap accessibility at toilet rooms
- Asbestos abatement
- Refinish gym floor
- Masonry restoration
- Replace existing pool roof
- Replace original steam boilers with new, more energy-efficient boilers
- Replace miscellaneous electrical panels
- Replace overhead stage rigging
- Renovate basement locker room
- Replace non-code compliant press box and structure
- Concession stand upgrades
- Greenhouse improvements
Middle School:
- Replace 14 heating / ventilating units
- Install new handicap-accessible Nurse’s toilet
- Kitchen ventilation
- Upgrade / replace water services
- Replace all corridor lockers
- Asbestos abatement
- Corridor flooring replacement
- Replace entire roof
Colden Elementary:
- Pavement reconstruction and sidewalk replacement
- Kitchen hood and piping replacement
- Asbestos abatement
- Replace all carpet with new vinyl flooring
- Roofing repairs
- New fire alarm system
Springville Elementary:
- Pavement reconstruction and sidewalk replacement
- Replace deteriorated site lighting with energy-efficient LED lighting
- Repave primary and intermediate playgrounds
- Replace vinyl asbestos flooring with new vinyl flooring
- Refinish gym and stage wood floors
- Partial roof replacement
- Masonry restoration
- New energy-efficient classroom ventilators and casework
- Replace original boilers with more energy-efficient boilers
- Replace gymnasium and cafeteria ceiling and lighting
District Offices:
- Roof replacement
- Upgrade toilet rooms for handicapped accessibility